Why the ground beneath your summerhouse matters more than you think
A summerhouse is only as good as the ground it sits on. It is tempting to focus on the building itself — the timber, the windows, the colour of the paint — but the base is what keeps everything else working. Get the ground preparation right and your summerhouse will sit square, the doors will glide open, and the windows will keep their alignment for years. Rush it, and you will soon notice sticking doors, draughty gaps and a building that twists with every change in the weather.
The good news is that preparing the ground is straightforward work. It is not technical, it does not need expensive equipment, and you can do most of it yourself over a weekend or two. What it does need is patience and a bit of care with levels. Here is how to go about it.
Choose the spot and work out your levels
Before you lift a spade, decide exactly where the summerhouse will stand. Pay attention to how the light moves across the garden during the day, how far the building will be from the house, and whether you want it screened by a hedge or fence. Leave enough room around the edges for maintenance, because you will need to reach the walls to treat or repaint the timber.
Next, check the fall of the ground. A summerhouse needs a base that is level in every direction, so if your chosen spot slopes, you will need to dig into the higher side and build up the lower side. Setting out a few pegs and stretching string lines between them gives you a clear picture of how much material you will need to shift. A simple spirit level on a straight timber batten will tell you how far out you are.
It also pays to watch where water goes. Ideally the finished base should sit slightly proud of the surrounding ground, with a gentle fall away from the building on all sides. That way, rainwater runs off rather than pooling underneath.
Clear the site properly
Mark out the footprint of the base, adding roughly 100mm on every side so you have a little working room. Then strip the site back to bare ground:
- Cut back and lift turf in sections, keeping the good pieces to one side if you plan to patch bare spots elsewhere.
- Dig out perennial weeds such as bindweed, ground elder, brambles and dock. Pull as much root as you can, because these will happily grow up through a membrane if any fragments are left behind.
- Remove stones, rubble, old roots and any buried debris. Anything soft or organic left in the ground will rot and settle over time.
- Treat the cleared area with a weedkiller if regrowth is likely, and allow the recommended waiting period before continuing.
This stage is the one most people try to skip. Try not to. Weeds and soft ground are the main reasons a base drops out of level in the first year or two.
Level and compact the soil
With the site cleared, dig over the area to a depth of about 100mm and break up any lumps. Rake it roughly level, then compact it. A plate compactor does the job quickly, but a heavy hand tamper or the end of a sturdy fence post works fine for a small base — you simply need to put in the effort and go over the whole area several times.
Check your levels again once the ground is firm. If you are building up a low corner, add a layer of compacted hardcore or MOT Type 1 rather than loose soil, which will settle. Keep checking with a long straight edge and a spirit level as you go, working across the site in both directions rather than just one.
Lay a weed membrane and build the sub-base
Once the ground is firm and level, roll out a woven weed control membrane across the whole footprint, overlapping the joins by at least 100mm. It should tuck up the sides slightly, and you can hold it down with pegs or a few shovelfuls of sand. This barrier stops weeds from pushing up into the base and also slows moisture rising from the soil below.
On top of the membrane, spread a layer of compacted hardcore or Type 1, roughly 75mm to 100mm deep, and compact it thoroughly. If you are laying paving slabs for the summerhouse to sit on, bed them on a sharp sand and cement mix, checking each one for level as you go. If you are using timber bearers or a timber floor frame instead, set them on concrete pads or paving slabs so no timber touches the ground directly.
Whatever method you choose, the finished surface must be flat, firm and level. Test it by walking across it and looking for any movement, and run a straight edge over it in several directions to check for hollows.
Small details that save big trouble later
- Leave a gap for airflow beneath the floor so damp cannot creep into the timber.
- Check levels one final time before the summerhouse goes down — once it is assembled, moving it is a major job.
- Allow the base to settle for a few days after compaction, particularly if you have added new material.
- Keep the surrounding ground clear of soil and plants that could bridge the damp course.
Do this work well and it will disappear from view, doing its quiet job for decades while you enjoy the summerhouse above it. Take an extra afternoon over the preparation, and the building will reward you with straight walls, smooth doors and a solid feel underfoot for many summers to come.













Summerhouses
Karla Gleichauf
12 May 2017 at 05:28 pm
On the other hand, we denounce with righteous indignation and dislike men who are so beguiled and demoralized by the charms of pleasure of the moment
M Shyamalan
12 May 2017 at 05:28 pm
On the other hand, we denounce with righteous indignation and dislike men who are so beguiled and demoralized by the charms of pleasure of the moment
Liz Montano
12 May 2017 at 05:28 pm
On the other hand, we denounce with righteous indignation and dislike men who are so beguiled and demoralized by the charms of pleasure of the moment